Video & Sound Production: Project 2


25/09/19-09/10/19 (Week 5-Week 7)

Angelina Lee An Qi (0334272)

Video & Sound Production

Project 2


Instructions


 

Project 2



Week 5: Arrangements of Video Shoot

Production House:

"Anything Production"

Director & Producer - Huang Yuet
Assistant Director - Julie (absent) Senta

Director of Photography - Farah
Camera Operator - Christine, Abigail
Lights - Kim

Art Director - Angelina
Assistant Art Director - Julie

Sound - Gordon

Actors - Eunice, Daryl


Week 6: Midnight Video Shoot

Fig. 1.1 Behind the scenes

Fig. 1.2

Fig. 1.3

Fig. 1.4

Fig. 1.5

Fig. 1.6

Fig. 1.7

Fig. 1.8

Fig. 1.9


Week 7: Video Editing

Fig. 2.1 Process of editing

Fig. 2.2

Fig. 2.3

The final result:





Reflections

Experience:

During the first week working on this project, we were showed the original advertisements in which we were about to recreate. I was hoping to get to work on the horror theme, and to my luck, I ended up in the group doing that. I helped to type out the roles of the members and created the chat group. I was in the role of art director, so what I mostly did was just help bring the props to the shoot and work on the costume and makeup of the actors. 

Observations:

At first, I did not expect to have the video shoot during the night. We started at 7PM and recorded up until 1AM. By the end of it, we were extremely tired. I felt like I could not function after that.

Findings:

Now that I think about it, having the video shoot at night makes sense. We were shooting a horror themed video, so darkness and eerie lighting is important. I don't think we could have achieved the same effect if we were to shoot in the day, even if we were in the same room.


Comments

Popular Posts